The 23rd Street Bridge will be a new pedestrian connection extending from the Buff Walk to north campus across Boulder Creek. This project replaces two bridges previously damaged by flooding. The new connection spans over the Boulder Creek Bike Path and Boulder Creek, traversing a 35 foot grade differential with an elevated canopy walk system. The trail was completed in 2019.
Location:
University of Colorado Boulder
Boulder, Colorado
Collaborators:
Otak (formerly Loris) – Lead, Civil/Structural Engineering
Icon Engineering – Flood Mapping
Clanton & Associates – Lighting/Electrical Design
- Campus Planning
- Habitat Restoration
- Illustration
- Landscape Architecture
- Trails